Compliance & Standards
Send your plans and site postcode before you order. Stardom can coordinate the product documents for the materials in your quote so your builder, engineer and building certifier can review them against your project requirements.
Standards and product evidence
- Light-gauge steel frames: AS/NZS 4600 is a cold-formed steel design standard. Review the project engineering, framing and connection details, and steel grade, thickness and coating records for the specified members.
- External windows and glazed doors: Review AS 2047 test evidence for the proposed configuration, including size and opening type, against the design wind and water performance requirements.
- Plumbing and tapware: For products that require WaterMark certification, check the exact model against the current certificate and product register. Check Lead Free WaterMark requirements where applicable.
- Electrical equipment: For supplied equipment subject to RCM requirements, verify the model, responsible supplier and registration or compliance documentation where required. Agree local supply and installation responsibilities with the project team.
- NCC evidence of suitability: Confirm the applicable NCC edition, state requirements and acceptance criteria with your project team. Product evidence must cover the proposed use, including relevant limitations and installation details.
Sample compliance pack checklist
Illustrative checklist for a builder or certifier review. Ask for the complete applicable reports and certificates for the exact products in your project.
- Project cover sheet with site, drawing revision, applicable requirements and scope of supply.
- Product schedule linking each item and model to its location, applicable requirement and evidence reference.
- Structural drawings and calculations, material records and relevant product test reports or certificates.
- Manufacturer installation details, limitations and checks for any proposed substitution.
- Register of outstanding evidence, actions, responsible parties and review status before production release.
Request project-specific evidence
Send the drawing revision, site postcode and products you are considering. Tell us what your engineer or certifier has requested. They assess product suitability and the applicable approval requirements for the project.